Westbury Hotel

Doyle Collection

This 205-bedroom hotel is currently being upgraded to modern standards on a phased basis, and Metec are also part of the Masterplan Team to significantly extend the hotel into an adjacent site under the client’s ownership. M&E Works completed to date have been in excess of €2m.

Challenges

Designing the upgrade of a full bedroom floor in a live 5 Star hotel provided many challenges, from working hours to phasing to minimise or eliminate disruption to paying clients. Delivering a standard of finish not seen in many projects in Ireland.

Successes

5th & 6th Floor bedroom upgrade and fire alarm/emergency lighting upgrades throughout the hotel completed to a very high standard and on budget. 4th floor design currently underway.

Metec Solutions

TV & Comms Upgrade, delivering fibre to each bedroom with 10 GB capability. Full upgrade of primary electrical services throughout the hotel. VRF Fan Coil systems added to each bedroom. LED Lighting throughout delivered to 2200K colour temperature for mood setting.

Electrical Services

  • New Generator, New Main Distribution Board and Sub Distribution Boards throughout the hotel.
  • New Fibre installation and Digital TV system throughout the hotel.
  • General services upgraded to each bedroom, including new LED lighting throughout bedrooms.
  • Full Upgrade of Life Safety Systems to front-of-house and back-of-house areas.
  • Phased upgrade of Bedroom Wings, preparing for future extension of hotel.
  • Integration with Public Realm Works to enhance Entrance and kerbside check-in.

Mechanical Services

  • Replacement of all VRF Heating/Cooling Systems on a phased basis.
  • Upgrade of bathrooms on a phased basis.
  • Preparation of site for future extension – enabling works.

Project Details

Client

Size

Duration

Professional Team

MOLA Architecture

Interactive Project Managers

Austin Reddy & Associates

Muir Associates

MSA Fire

Contractors