Coopers Cross

Kennedy Wilson

Challenges

The challenges we faced on this 500,000sq ft. commercial project was to meet the clients brief of LEED/BREAAM/WELL/Wiredscore and A rated BER certification and to ensure that both blocks had the flexibility for the multitude of possible letting scenarios ranging from a campus wide letting to a quarter floor letting. NZEB compliance was also a requirement in line with the latest Part L Regulations.

Successes

The project is now well into construction and the significant pre construction co-ordination and detailing carried out in Revit is reaping benefits with the onsite construction team. The project is also on target to achieve all of the clients sustainability goals. Metec also modelled and advised the client on the internal daylighting requirements to ensure that 2% is being achieved on all floors including the lower ground floors.

Metec Solutions

  • Full BIM Design Shell and Core and CAT A MEP
  • Best in Class new MEP equipment to satisfy
  • the Sustainability targets
  • Full flexibility for tenant sub-let strategy

Electrical Services

  • New LEED Platinum compliant energy metering solution
  • Roof Mounted PV Solution
  • Wiredscore compliant IT infrastructure
  • Most Flexible Electrical Design for potential tenancies
  • Complete new Shell and Core & Cat A Electrical Infrastructure

Mechanical Services

  • Best in Class Low Energy Engineering Solutions to achieve the energy targets
  • Fully flexible mechanical design to suit potential occupancies
  • Increased Ventilation available above normal office building standards
  • Rain & Grey Water Harvesting System

Project Details

Client

Size

500,000 sq. ft.

Duration

Professional Team

Linesight QS

Lafferty PM

Henry J Lyons

Designer Group

Contractors

Sisk Group

BMCE Structural Consultant