Primark Belfast - The Bank Building

Primark

The entire Mechanical and Electrical Engineering Services and Sprinkler systems were redesigned and installed to the new post fire layouts. Working closely with our design and construction partners, the various challenges of working on restoring the building were overcome collaboratively with the team

The biggest change was the significant improvement in the energy rating of the building from an “E” pre fire to a “B” EPC post Fire. The nett impact was 30% on the thermal performance and energy reduction as a consequence. This equates to a circa 2,900 mWh total energy reduction and 500,000 kgCO2 total carbon reduction.

  • OPENED – POST TRAGIC FIRE IN 2018

  • 4 YEARS OF INTENSIVE RESTORATION

  • BUILDING & ARCHITECT OF THE YEAR AWARD 2023