Metec carried out the mechanical & electrical shell & core fit-out of a multi-storey building consisting of basement carpark, roof, plantroom, retail, office space and food & beverage units.
The Initial Electrical loading was estimated at circa. 1.7 MVA. The local Electrical infrastructure was not capable of supporting this level of load. The location and quantity of new Substations would be critical for the optimal cable routing and distances.
We carried out several design options to optimise Substation location with regards to cable routing and distances. We engaged with ESB Networks and after several consultations we agreed on a location and new diversified load of 1250KVA. The new development required 2 No. Single MV Substations and associated LV Switchrooms to ensure sufficient capacity for future tenants.
Flexible M&E infrastructure that allows for division and sub-division of unit spaces to accumalate specific client fit-out requirements.
Eamonn Traynor & Company QS
Lafferty PM
JSA Architects
JJ Rhatigan
Tim Kelly Group
Barret Mahony Consulting Engineers