This recently-refurbished 140-Bedroom Hotel presented many challenges on a tight urban site, but through design with Revit/BIM resulted in a state-of-the-art finish in a highly-coveted city centre location. The M&E value was in excess of €5m.

Challenges

Designing, upgrading and extending a full hotel within the confines of a tight urban site.

Successes

Design through Revit/BIM ensured upgrades throughout the Hotel were completed to a very high standard and on budget.

Metec Solution

  • TV & Comms upgrade, with 1 GB capability
  • Full upgrade of Primary Electrical services throughout the Hotel
  • VRF Fan Coil systems added to each bedroom
  • LED Lighting throughout delivered to 2600K colour temperature for mood setting

Electrical Services

  • New Generator, New Main Distribution Board and Sub Distribution Boards throughout hotel
  • New Comms installation throughout thehotel, new Digital TV system installed. Hotel Management System, incorporating EPOS systems
  • General Services Upgraded to each bedroom, including new LED lighting throughout bedrooms
  • Full Upgrade of Life Safety Systems to front-of-house and back-of-house areas
  • Integration with Public Realm Works to enhance Entrance and kerbside Check-in

Mechanical Services

  • Replacement of all VRF Heating/Cooling Systems
  • Upgrade of all bathrooms throughout the hotel

Project Details

Client

Size

Duration

Professional Team

LJM Quantity Surveyors

HRA Architects

JJ Campbell & Associates

Jensen/JGA Fire

Contractors

M&P Construction

More amazing projects!

We're here to help you out.